The topic filter applies to evidence readings below. Corrections and selected analyses cover the whole site.
How to read the clock → “Dated” is the original record date; the reading states its observation period. An evidence date is retained as recorded and does not by itself establish a publication or incorporation date. A layout change does not recheck the evidence.
Follow these updates · RSS feed
Selected analysis
Budget 2026: where the money for new commitments came from
The deficit for this fiscal year is close to the spring forecast. Under that figure, the forecast improved by $158 billion over five years and new commitments used $152 billion of it. This page traces the figures through the budget’s own tables.
Read from Budget 2026 as published on November 10, 2026. Figures are the budget’s own projections, not results.
Ottawa’s red-tape reset reaches far beyond paperwork
How Ottawa’s proposed changes could affect business restructuring, electricity storage, trade and development near airports.
Proposed changes, read from the first-reading bill. This is a dated analysis, not a current bill-status check.
British Columbia’s next growth test
Real output has more than doubled since the late nineties. Growth per resident is slower, the ports serve a national production base, and the pre-election fiscal plan leaves a large deficit.
The next post-election budget is not yet available to test the fiscal posture. Project announcements do not establish future production, royalties or net public benefits.
What does Canada's defence spending buy? · Recent record: 2026-10-13 to 2026-11-11. The window follows recorded checks, material corrections and selected analyses. Qualification and wording notices do not move it.
Filter evidence readings by topic
Recent evidence readings
Showing 1 of 1 readings in this window, newest first. The remaining entries are in the full record below and the monthly archives.
Change type and importance are separate editorial decisions. An issuer revision can be material or minor; a checked-unchanged reading is still a finding. Minor changes include housekeeping only when the recorded effect warrants that description.
Evidence update · Material change
Budget 2026 shows core defence spending at 2.2% of the economy in fiscal 2026–27 and 2.6% in each year from 2027–28 to 2030–31, on a cash basis. NATO's pledge is 3.5% for core defence by 2035.
More on this: What does Canada's defence spending buy? →
Why it stands: Chapter 5, Table 5.1. The budget separately shows $50.4 billion to $58.3 billion a year of defence- and security-related funding. In each year that equals 1.5% of NATO's forecast of the economy, within rounding. The budget says Canada is on track to reach 5% by 2035; its tables stop at 2030–31.
The published plan shows the 1.5% part of the pledge in full and the core part 0.9 percentage points below its 2035 level in 2030–31, the last year its tables show.
Trigger recorded for this reading: NATO's next defence expenditure report.
Limit: These are the government's plans on its own count, using NATO's forecast of the economy. They are not NATO estimates. The table's note says it does not include future commitments.
Reads onto the Big Question it bears on · the Brief it reads from · the Brief it reads from
Monthly evidence archives
Site-wide corrections and wording amendments
Record-dated corrections: 2026-10-13 to 2026-11-11. Material qualification notices: 2026-10-13 to 2026-11-11. Minor wording notices: 2026-10-13 to 2026-11-11.
These notices change published explanations, claims or wording. They do not report new observations. Each link preserves what was wrong, the replacement and its effect.
- Dollarama geography and quarter length Qualification dated 2026-11-04. The Canadian store-count observation is retained. Consolidated sales are not a measure of Canadian discount spending or evidence of household motivation.
- Labour headcount comparison and annual window Identified 2026-10-27. The summary and shared claim explanation change. The September employment and population observations, annual ratio of 0.52 and earlier dated readings are unchanged.
- EI successor rules and historical expiry notice Identified 2026-10-27. The rule history is brought forward; the original regulation and original notice are preserved. No employment observation changes.
- Monthly trade reference periods Identified 2026-10-27. The date comparison changes. Trade values, statistical bases, legal dates and the daily counts are unchanged.
- Alberta statistical balance and legal compliance Identified 2026-10-27. The legal-compliance inference and its associated pace verdict are withdrawn. This correction does not adjudicate the separately registered Ontario and Quebec statistical trend proxies, whose basis classifications remain under the combined fiscal review. The statistical balance of 1.29% of GDP in 2024 is unchanged. This makes no finding about Alberta's actual compliance.
- Ontario and Quebec statistical balances beside fiscal-year promises Identified 2026-10-27. The pace inference is withdrawn for Ontario and Quebec. Statistical values are unchanged. This makes no finding about actual provincial compliance.
- US Monitor overview reference periods Identified 2026-10-27. This completes the overview counterpart of the October 27 panel-date correction. Statistical values and legal dates are unchanged; no tariff-effect inference is made.
Material corrections and withdrawals in the evidence log
- Dated 2026-11-10: Two previously admitted selected findings are withdrawn from current use after recomputation: the Quebec balance streak and the earlier employment level-shift window. Their historical receipts remain available. Limit: Withdrawal does not erase the prior source edition or establish a causal explanation. A new selected window requires its own examination before admission.
Minor wording amendments (1) — no analytical conclusion changes
- Minor wording amendment — IRCC method limits Correction dated 2026-10-28. Wording only. No observation, calculation policy, precision or analytical conclusion changes.
Recorded release calendar — checked through 2026-11-11
This calendar retains the log’s original check date. Dates and then-future descriptions below are not a new check of an issuer’s schedule.
Official releases that could change the answer — next 14 days
| Date | Issuer | Release | What it could change | Products |
|---|---|---|---|---|
| 2026-11-12 | Statistics Canada | Building permits, September 2026 Confirmed date | The next unadjusted dwelling-unit count and prior revisions. Date stated in the issuer’s October 14 August permits release. | Canadian Capacity Monitor · Housing shortage (Big Question) |
| 2026-11-16 | Statistics Canada | Consumer Price Index, October 2026 Confirmed date | The matched-month price, rent, core and wage comparison. Date stated in the September issuer release captured October 19. | Housing shortage (Big Question) · The price of everything: one headline rate, and the components underneath it |
Just beyond 14 days
| Date | Issuer | Release | What it could change | Products |
|---|---|---|---|---|
| 2026-11-27 | Statistics Canada | National Accounts (GDP and gross fixed capital formation), Q3 2026 Provisional — typical cadence | Whether the turn in real GDP per person holds for a second quarter, whether output per worker keeps adding, and whether the per-person level finally passes its 2022 Q3 record; on the capital side, a third quarter of 2026 investment, still one quarter short of a calendar year. The issuer may also restate the two quarters this release just settled. Date provisional: it follows the issuer's observed quarterly cadence of publishing about two months after the quarter ends, and no source captured for these readings pins it. | Investment into productivity (Big Question) · Living standards (Big Question) · The capital behind each worker: the investment record, and the productivity record beside it · The anatomy of Canadian living standards |
| 2026-12-08 | Statistics Canada | Canadian international merchandise trade, October 2026 Confirmed date | The next matched trade month and historical revisions. Date stated in the captured November 4 issuer article. | US Exposure Monitor · Sell beyond the us (Big Question) · Canada's exports and the United States: the record break, and where the difference went |
| 2026-12-15 | Environment and Climate Change Canada | Greenhouse gas and air pollutant emissions projections report and target-accounting-basis update (adds the 2024 accounting-basis observation) Provisional — typical cadence | The delivered-share and pace-ratio readings on the target-accounting basis, the With Measures/With Additional Measures 2030 projections and their gap to the target band, and the 2026 interim-objective scenario check -- the principal settlement event for this Brief's first re-reading. | Climate account (Big Question) · The distance still to travel |
| 2026-12-31 | Environment and Climate Change Canada / UNFCCC | Canada's second Biennial Transparency Report (statutory Paris Agreement deadline) Confirmed date | Corroborates or updates the LULUCF accounting-contribution methodology and the target-accounting statements this Brief cites; carried unresolved if it lands before this Brief can ingest it. | Climate account (Big Question) · The distance still to travel |
| 2027-04-15 | Environment and Climate Change Canada | National Inventory Report, next edition (adds the 2025 gross-inventory observed year) Provisional — typical cadence | The gross-inventory basis's delivered-share and pace-ratio readings, the seven-sector ledger, and the moving-baseline chapter's own comparison; a full re-ingest of the new vintage with the prior vintage preserved, revision separated from new-year movement. | Climate account (Big Question) · The distance still to travel |
| 2027-12-15 | Environment and Climate Change Canada | Statutory progress report on the 2030 Emissions Reduction Plan, next edition Provisional — typical cadence | The official-assessment quotations this Brief cites and the secondary sector indicators; never a verdict source by itself. | Climate account (Big Question) · The distance still to travel |
Copyright © 2004-2022 Independent Electricity System Operator, all rights reserved. This information is subject to the Terms of Use set out in the IESO’s website (www.ieso.ca)