Statistics Canada's measured electricity record: annual installed capacity through 2025 and monthly generation through July 2026, at the national all-producers total

Canada's measured electricity system as Statistics Canada's surveys state it: installed generating capacity (table 25-10-0022-01, annual, through reference year 2025, released 2026-10-19) and electric power generation (table 25-10-0015-01, monthly, through reference month July 2026, released 2026-09-29), both at the Canada / total-all-classes-of-producer / total-all-types coordinate. This is the measured side of the electricity record -- what the system has actually installed and generated -- kept deliberately separate from any issuer's modelled pathway.

A Resolution record follows one institution's figures for a defined quantity. It may contain projections, estimates or measured observations. Each version held here keeps its publication date and source, so a newer figure does not erase the earlier one. What is a Resolution record? →

Maintained record. This page preserves successive versions of an official record. It makes no projection and awaits no forecast verdict. Revisions remain visible, and provisional figures retain that status.

The lineage

VintageIssuerPublishedPositionSource
2026-04 reference month (released 2026-06-30)Statistics Canada2026-06-30supersededSource → · accessed 2026-07-17
2024 reference year (released 2025-10-27)Statistics Canada2025-10-27supersededSource → · accessed 2026-07-17
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Statistics Canada2026-06-30supersededSource → · accessed 2026-07-24
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24Statistics Canada2025-10-27currentSource → · accessed 2026-07-24
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Statistics Canada2026-06-30supersededSource → · accessed 2026-07-24
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24Statistics Canada2025-10-27currentSource → · accessed 2026-07-24
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Statistics Canada2026-06-30supersededSource → · accessed 2026-07-24
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24Statistics Canada2025-10-27currentSource → · accessed 2026-07-24
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Statistics Canada2026-06-30supersededSource → · accessed 2026-07-24
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24Statistics Canada2025-10-27currentSource → · accessed 2026-07-24
July 2026 reference month; released September 29, captured September 29, 2026Statistics Canada2026-09-29currentSource → · accessed 2026-09-29
July 2026 reference month; released September 29, captured September 29, 2026Statistics Canada2026-09-29currentSource → · accessed 2026-09-29
July 2026 reference month; released September 29, captured September 29, 2026Statistics Canada2026-09-29currentSource → · accessed 2026-09-29
July 2026 reference month; released September 29, captured September 29, 2026Statistics Canada2026-09-29currentSource → · accessed 2026-09-29
July 2026 reference month; released September 29, captured September 29, 2026Statistics Canada2026-09-29currentSource → · accessed 2026-09-29
2025 reference year; October 19, 2026 edition including revised 2024Statistics Canada2026-10-19currentSource → · accessed 2026-10-19
VintagePeriodValueRoleAssuranceBasis
2024 reference year (released 2025-10-27)2014 (installed capacity)135,088.0 MWinstitutional estimate——
2024 reference year (released 2025-10-27)2023 (installed capacity)150,937.7 MWinstitutional estimate——
2024 reference year (released 2025-10-27)2024 (installed capacity; latest published reference year)156,388.5 MWinstitutional estimate——
2026-04 reference month (released 2026-06-30)Calendar year 2023 (generation)615,332.8 GWhinstitutional estimate——
2026-04 reference month (released 2026-06-30)Calendar year 2024 (generation)609,488.1 GWhinstitutional estimate——
2026-04 reference month (released 2026-06-30)Calendar year 2025 (generation)625,212.4 GWhinstitutional estimate——
2026-04 reference month (released 2026-06-30)Twelve months ending April 2026 (generation)625,010.7 GWhinstitutional estimate——
2026-04 reference month (released 2026-06-30)Twelve months ending April 2025 (generation)626,923.6 GWhinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242014 (Quebec: total installed capacity)44,151.3 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242023 (Quebec: total installed capacity)46,307.4 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242024 (Quebec: total installed capacity)46,274.9 MWinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2026 (Quebec: total electricity generation)188,463.7 GWhinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2025 (Quebec: total electricity generation)194,703.8 GWhinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242014 (Ontario: total installed capacity)35,322.3 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242023 (Ontario: total installed capacity)40,248.3 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242024 (Ontario: total installed capacity)42,026.4 MWinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2026 (Ontario: total electricity generation)171,188.2 GWhinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2025 (Ontario: total electricity generation)167,612.8 GWhinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242014 (Alberta: total installed capacity)13,909.0 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242023 (Alberta: total installed capacity)16,936.2 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242024 (Alberta: total installed capacity)20,180.5 MWinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2026 (Alberta: total electricity generation)86,071.4 GWhinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2025 (Alberta: total electricity generation)83,318.8 GWhinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242014 (British Columbia: total installed capacity)16,041.7 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242023 (British Columbia: total installed capacity)18,680.8 MWinstitutional estimate——
Reference years 2006 through 2024 (the cube's latest), captured 2026-07-242024 (British Columbia: total installed capacity)18,780.1 MWinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2026 (British Columbia: total electricity generation)67,322.3 GWhinstitutional estimate——
Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24Twelve months ending April 2025 (British Columbia: total electricity generation)62,122.9 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2025 (generation)627,557.3 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2026 (generation)634,612.2 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2025 (generation)191,040.4 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2026 (generation)189,705.5 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2025 (generation)170,134.5 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2026 (generation)172,363.0 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2025 (generation)84,914.6 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2026 (generation)85,420.8 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2025 (generation)63,013.4 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Twelve months ending July 2026 (generation)72,685.1 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Calendar year 2023 (generation)615,332.8 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Calendar year 2024 (generation)609,488.1 GWhinstitutional estimate——
July 2026 reference month; released September 29, captured September 29, 2026Calendar year 2025 (generation)625,212.4 GWhinstitutional estimate——
2025 reference year; October 19, 2026 edition including revised 20242014 installed capacity (October 19, 2026 edition)135,088.0 MWinstitutional estimate——
2025 reference year; October 19, 2026 edition including revised 20242023 installed capacity (October 19, 2026 edition)150,937.7 MWinstitutional estimate——
2025 reference year; October 19, 2026 edition including revised 20242024 installed capacity (October 19, 2026 edition; revised)155,749.4 MWinstitutional estimate——
2025 reference year; October 19, 2026 edition including revised 20242025 installed capacity (October 19, 2026 edition)155,906.4 MWinstitutional estimate——

Movement between vintages

This record shows what an institution published and how its figures compare across versions or with later outcomes. It does not rank institutions or grade their forecasting ability.

ComparisonCompared vintagesMovementBasis
Installed capacity, 2023 to 20242024 reference year (released 2025-10-27) (institutional estimate 150,937.7 MW) vs. 2024 reference year (released 2025-10-27) (institutional estimate 156,388.5 MW)+5,450.8 MWsame issuer
Installed capacity, 2014 to 2024 (ten years)2024 reference year (released 2025-10-27) (institutional estimate 135,088.0 MW) vs. 2024 reference year (released 2025-10-27) (institutional estimate 156,388.5 MW)+21,300.5 MWsame issuer
Generation, calendar 2023 to calendar 2024July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 615,332.8 GWh) vs. July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 609,488.1 GWh)-5,844.7 GWhsame issuer
Generation, calendar 2023 to calendar 2025July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 615,332.8 GWh) vs. July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 625,212.4 GWh)+9,879.6 GWhsame issuer
Generation, trailing twelve months to July 2026 vs the year-earlier windowJuly 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 627,557.3 GWh) vs. July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 634,612.2 GWh)+7,054.9 GWhsame issuer
Installed capacity, Quebec: 2023 to 2024Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 46,307.4 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 46,274.9 MW)-32.5 MWsame issuer
Installed capacity, Quebec: the 2014-2024 decadeReference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 44,151.3 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 46,274.9 MW)+2,123.6 MWsame issuer
Generation, Quebec: trailing twelve months ending July 2026 against the year-earlier windowJuly 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 191,040.4 GWh) vs. July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 189,705.5 GWh)-1,334.9 GWhsame issuer
Installed capacity, Ontario: 2023 to 2024Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 40,248.3 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 42,026.4 MW)+1,778.1 MWsame issuer
Installed capacity, Ontario: the 2014-2024 decadeReference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 35,322.3 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 42,026.4 MW)+6,704.1 MWsame issuer
Generation, Ontario: trailing twelve months ending July 2026 against the year-earlier windowJuly 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 170,134.5 GWh) vs. July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 172,363.0 GWh)+2,228.5 GWhsame issuer
Installed capacity, Alberta: 2023 to 2024Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 16,936.2 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 20,180.5 MW)+3,244.3 MWsame issuer
Installed capacity, Alberta: the 2014-2024 decadeReference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 13,909.0 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 20,180.5 MW)+6,271.5 MWsame issuer
Generation, Alberta: trailing twelve months ending July 2026 against the year-earlier windowJuly 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 84,914.6 GWh) vs. July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 85,420.8 GWh)+506.2 GWhsame issuer
Installed capacity, British Columbia: 2023 to 2024Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 18,680.8 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 18,780.1 MW)+99.3 MWsame issuer
Installed capacity, British Columbia: the 2014-2024 decadeReference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 16,041.7 MW) vs. Reference years 2006 through 2024 (the cube's latest), captured 2026-07-24 (institutional estimate 18,780.1 MW)+2,738.4 MWsame issuer
Generation, British Columbia: trailing twelve months ending July 2026 against the year-earlier windowJuly 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 63,013.4 GWh) vs. July 2026 reference month; released September 29, captured September 29, 2026 (institutional estimate 72,685.1 GWh)+9,671.7 GWhsame issuer
Generation, calendar 2023 to calendar 20242026-04 reference month (released 2026-06-30) (institutional estimate 615,332.8 GWh) vs. 2026-04 reference month (released 2026-06-30) (institutional estimate 609,488.1 GWh)-5,844.7 GWhsame issuer
Generation, calendar 2023 to calendar 20252026-04 reference month (released 2026-06-30) (institutional estimate 615,332.8 GWh) vs. 2026-04 reference month (released 2026-06-30) (institutional estimate 625,212.4 GWh)+9,879.6 GWhsame issuer
Generation, trailing twelve months to April 2026 vs the year-earlier window2026-04 reference month (released 2026-06-30) (institutional estimate 626,923.6 GWh) vs. 2026-04 reference month (released 2026-06-30) (institutional estimate 625,010.7 GWh)-1,912.9 GWhsame issuer
Generation, Quebec: trailing twelve months ending April 2026 against the year-earlier windowReference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 194,703.8 GWh) vs. Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 188,463.7 GWh)-6,240.1 GWhsame issuer
Generation, Ontario: trailing twelve months ending April 2026 against the year-earlier windowReference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 167,612.8 GWh) vs. Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 171,188.2 GWh)+3,575.4 GWhsame issuer
Generation, Alberta: trailing twelve months ending April 2026 against the year-earlier windowReference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 83,318.8 GWh) vs. Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 86,071.4 GWh)+2,752.6 GWhsame issuer
Generation, British Columbia: trailing twelve months ending April 2026 against the year-earlier windowReference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 62,122.9 GWh) vs. Reference months 2008-01 through 2026-04 (the cube's latest), captured 2026-07-24 (institutional estimate 67,322.3 GWh)+5,199.4 GWhsame issuer
Installed capacity, 2014 to 2025 (October 19, 2026 edition)2025 reference year; October 19, 2026 edition including revised 2024 (institutional estimate 135,088.0 MW) vs. 2025 reference year; October 19, 2026 edition including revised 2024 (institutional estimate 155,906.4 MW)+20,818.4 MWsame issuer
Installed capacity, 2023 to 2024 (October 19, 2026 edition)2025 reference year; October 19, 2026 edition including revised 2024 (institutional estimate 150,937.7 MW) vs. 2025 reference year; October 19, 2026 edition including revised 2024 (institutional estimate 155,749.4 MW)+4,811.7 MWsame issuer
Installed capacity, 2024 to 2025 (October 19, 2026 edition)2025 reference year; October 19, 2026 edition including revised 2024 (institutional estimate 155,749.4 MW) vs. 2025 reference year; October 19, 2026 edition including revised 2024 (institutional estimate 155,906.4 MW)+157.0 MWsame issuer
Evidence qualifications (8)
Latest source: Statistics Canada's measured electricity record: annual installed capacity through 2025 and monthly generation through July 2026, at the national all-producers total · accessed 2026-09-29

Related on this site

This record shows what an institution published and how its figures compare across versions or with later outcomes. It does not rank institutions or grade their forecasting ability.

This is the current public record for this lineage. See Work with Countability for a commissioned projection-resolution question.

Work with Countability